Management of MV/LV Transformer Replacement Based on AMI Platform

Zarządzanie wymianą transformatorów SN/nn przy wykorzystaniu systemu AMI

Krzysztof DOBRZYNSKI; Slawomir NOSKE; Dominik FALKOWSKI

s. 108-126 DOI: 10.17274/AEZ.2023.53.03

Abstract

The paper presents the extended possibilities of managing the selection and replacement of MV/LV transformers using the measurement data from the Advanced Metering Infrastructure (AMI) system. The analysis was conducted on samples of over 1900 transformers that operate in two different types of MV grids: rural and urban. The analysis has shown that there is a great potential in the field of optimizing the rated power of the transformers.

Streszczenie

Artykuł opisuje rozszerzenie możliwości zarządzania doborem i wymianą transformatorów SN/nn przy wykorzystaniu danych pomiarowych z systemu Advanced Metering Infrastructure (AMI). Analizy przeprowadzono na próbce ponad 1900 transformatorów, które pracują w dwóch różnych typach sieci SN: sieci obejmującej teren wiejski i teren miejski. Przeprowadzone analizy pokazują, że istnieje duży potencjał w zakresie optymalizacji mocy transformatorów.

Keywords

MV/LV transformer, AMI system, energy losses

Słowa kluczowe

transformator SN/nn, system AMI, straty energii

Rys. / Fig.

Bibliografia / Bilbiography

[1] European Commission: "Directive of the European Parliament and of the Council on energy efficiency.", COM (2021) 558 final/2, Brussels, 2021.
[2] "Polish Energy Law.", Act of April 10, 1997 as amended.
[3] K. S. Kavithakumari, P. P. Paul and E. CatherineAmalaPriya: "Advance metering infrastructure for smart grid using GSM.", 2017 Third International Conference on Science Technology Engineering & Management (ICONSTEM), 2017, pp. 619-622, doi: 10.1109/ICONSTEM.2017.8261396.
[4] K. Dobrzynski, Z. Lubosny, J. Klucznik and R. Rekowski: "Identification of the customer meter assignment to phases in LV grid: Selected issues of UPGRID project realization.", 2017 IEEE 21st International Conference on Intelligent Engineering Systems (INES), 2017,
pp. 000181-000186, doi: 10.1109/INES.2017.8118552.
[5] W. Luan, J. Peng, M. Maras, J. Lo and B. Harapnuk: "Smart Meter Data Analytics for Distribution Network Connectivity Verification.", in IEEE Transactions on Smart Grid, vol. 6, no. 4, pp. 1964-1971, July 2015, doi: 10.1109/TSG.2015.2421304.
[6] S. Roy, B. Bedanta and S. Dawnee: "Advanced Metering Infrastructure for real time load management in a smart grid.", 2015 International Conference on Power and Advanced Control Engineering (ICPACE), 2015, pp. 104-108, doi: 10.1109/ICPACE.2015.7274926.
[7] J. I. Lee, C. S. Choi, W. K. Park and I. W. Lee: "Home energy management system internetworking with advanced metering infrastructure.", 2012 International Conference on ICT Convergence (ICTC), 2012, pp. 297-298, doi: 10.1109/ICTC.2012.6386843.
[8] B. Nithin, S. Bhaskaran and Ullas S: "Advanced metering infrastructure (AMI) with combination of peak load management system (PLMS) and theft protection.", 2016 Online International Conference on Green Engineering and Technologies (IC-GET), 2016, pp. 1-6,
doi: 10.1109/GET.2016.7916727.
[9] H. R. P. M. de Oliveira et al.: "Economical profits in medium voltage networks obtained by rearrangement of installed transformers.", 2010 Modern Electric Power Systems, 2010, pp. 1-6.
[10] L. Wang and J. Zhu: "Research of marketing-distribution-dispatching integrated system in rural grid.", 2015 5th International Conference on Electric Utility Deregulation and Restructuring and Power Technologies (DRPT), 2015, pp. 2668-2671,
doi: 10.1109/DRPT.2015.7432699.
[11] A. Khare, S. K. Bajpai and M. Choubey: "Restructuring of 11/.4 kV Distribution Network of JNKVV Jabalpur to Minimize Losses and Demand.", 2013 International Conference on Communication Systems and Network Technologies, 2013, pp. 817-821, doi: 10.1109/CSNT.2013.174.
[12] A. A. A. de Souza, N. Kagan and K. de Geus: "A multiagent system approach and integer linear programming for transformers relocation in power distribution system.", 2015 IEEE PES Innovative Smart Grid Technologies Latin America (ISGT LATAM), 2015, pp. 92-97,
doi: 10.1109/ISGT-LA.2015.7381135.
[13]C. Drury: "Rachunek kosztów.", PWN Warszawa, 1995
[14] "Rachunek kosztów w elektroenergetyce.", Oficyna Wydawnicza Politechniki Warszawskiej, Warszawa, 1999
[15] W. Szpyra: "Optimal ratings of transformer installed in power distribution network taking into account growth of loadings during exploitation period (in polish).", Przegląd Elektrotechniczny, 2006, R.82, nr 9, pp. 75-77.
[16] Ayman Agha, Hani Attar, Ashish Kr. Luhach: "Optimized Economic Loading of Distribution Transformers Using Minimum Energy Loss Computing.", Mathematical Problems in Engineering, vol. 2021, Article ID 8081212, 9 pages, 2021. https://doi.org/10.1155/2021/8081212.
[17] A. Wu and B. Ni: "Line Loss Analysis and Calculation of Electric Power Systems.", Wiley& Sons, Hoboken, NJ, USA, 1st edition, 2016.